The project includes Engineering, Procurement and Construction of two Water Treatment Plants for Alba.
DM1 Plant: Considering the demand of Demineralized Water of Alba Power Station 5 and future upgradation, it was necessary to install a new Demineralized (DM) Water Plant. The project included Design, Supply, Installation & Commissioning of Two Pass Reverse Osmosis (RO) Plant along with Electro De-Ionization (EDI) Units with a total output capacity of 75 M3/Hr.