Asset Protection and Security Building Project for Tatweer Petroleum

Project Background:

Construction of a New Ground + 01 Building (28M x 16M) as an annexure to TP Headquarters compound area and a Guard house with entrance canopy.

The scope of work includes Modification of the existing compound wall precast panels, Complete Civil and Concrete Works, Complete Plumbing and Drainage Installation works, Acoustic Mineral Fiber Ceiling Works, HVAC Air-Conditioning System, Access Control & Voice System, Fire Alarm & Fire Fighting System, Portable Elevator, CCTV, Landscaping & Irrigation Works, Water Supply works, Complete Electrical Works, Roof Insulation & Water Proofing system and Internal & External Painting works.

Project Scope & Highlights:

  • Project Duration- 16 Months (June.2020 – Oct.2021)
  • Total Man-Hours- 154,256 without LTI
  • Excavation Works- 1,100 Cu. M
  • Concrete Works- 375 Cu. M
  • Rebar Works- 100 Ton
  • Paving Works- 500 Sq. M
  • Structural Steel Works- 25 Ton
  • Fire Fighting Piping Works- 2,150 Inch Dia.
  • Elevator Installation- 1 Nos
  • Water Proofing Works- 475 Sq. M
  • Total Area Painted- 1,150 Sq. M
  • Equipments Installed- 30 Nos (Air-conditioning/Pumps)
  • Electrical Cabling Works- 3,500 M