T&I SHUTDOWN WORKS FOR CENTRAL GAS PLANT – TRAIN III

MCSC executed a major Shutdown Hub 1 in BAPCO, a Maintenance Project for the Turnaround and Inspection of 12 operating units in the refinery. Hub-1 Shutdown was one of the most complex T & I work executed in BAPCO.

Project Highlights:

Project scope includes T&I Shutdown Works of 101 Major Equipment’s like Columns, Vessels, Reactor, Heat Exchanger, Heaters, Tank, Flare Stack, Revamp works

  • Total man-hours: 250,000 without LTI
  • Duration: 19 August 2022 to 19 October 2022

Major jobs executed by MCSC during the T&I are given below.

  • 1HCU (8 Columns)
  • 2H2 (1 Reformer Furnace, 1 PG Boiler)
  • 2SRU (2 Columns, 11 Vessels, 2 Waste Heat Boiler, 2 Claus Combustors)
  • 6VDU (1 Column, 26 Vessels)